Location: Toronto, Ontario
Designer/Architect: Denis Heath, Architect
Duration: May 2001 - Jan 2002
Scope: Soheil Mosun Limited was contracted to fabricate and install a main steel staircase and balustrades as well as two (2) mezzanine staircases and second floor balustrades and (206) linear feet of handrail.
Highlights: These staircases are made of steel and features pan type treads for concrete fill, and glass risers. The staircases, balustrades and railings were primed then painted to match client specifications.